KUCHING, Nov 11 2026: Gabungan Parti Sarawak (GPS) chairman Abang Johari Openg has confirmed that Sarawak United People's Party (SUPP) president Dr Sim Kui Hian will defend his Batu Bawa seat in next month's state election.
Caption: Premier Abang Johari Openg hints that Wilfred Yap (Kota Sentosa), Lo Khere Chiang (Batu Kitang) and Ding Kuong Hiing (Meradong) will defend their respect seats.He made the confirmation at the ground breaking ceremony of Jalan Batu Kawa-Jalan Stephen Yong road project, costing RM207.88 million.
"The state has changed a lot, but don't change Dr Sim. I, as chairman of GPS, and we have discussed about it, Dr Sim must contest in Batu Kawa," he said.
"Only then the development that we have planned in Batu Kawa can be carried on," he said.
Abang Johari, who is also the premier, warned the people not to rock the boat "or else, it will sink", urging the people to continue to give their support to GPS.
He urged the people to reject the state DAP in Batu Bawa in the state election on Dec 12, 2026.
"We have a bright future ahead of us from now until 2030 and beyond," he said.
He said by 2030, Sarawak is targeting to become a high income economy, but "because we able to work together and we work hard, we have already becoming a high income region in 2022 as stated by the World Bank," he said.
The premier also hinted that Wilfred Yap (Kota Sentosa), Lo Khere Chiang (Batu Kitang) and Ding Kuong Hiing (Meradong) will defend their respect seats.
They were present at the grounding ceremony of the road project.
"Dont change them. They are the champions.
"There were people who talked about checks and balances. The fact is these people were scared of us winning all the 82 seats.
"It is true that we want to win all the seats," he said.
The road project involves the construction of a new 5.664-kilometer road, built to U3 standards with two lanes in each direction. It will connect the Batu Kawa–Matang junction (Sungai Moyan) to the Jalan Stephen Yong junction.
Key components of the project include the construction of two reinforced concrete (R.C.) bridges: one spanning 74.8 meters across Sungai Moyan, and another spanning 280.8 meters across the Sarawak River.
The project scope also encompasses the construction of culverts and drainage systems, the installation of street lighting, the development of signalized junctions and access roads, as well as the necessary relocation and protection of existing utility infrastructure.
The implementation of the project is expected to provide a more strategic alternative route for residents in Batu Kawa, Matang, and the surrounding areas, thereby helping to reduce reliance on existing routes.
Based on the project plan, this new route has the potential to reduce traffic congestion on Jalan Batu Kawa–Kuching by up to 30 percent, while improving the fluidity of daily travel and enhancing accessibility for residents.
The provision of a more comprehensive road network is also expected to facilitate the movement of residents, increase the efficiency of the transport system, and strengthen connectivity between residential areas, business hubs, and new development zones.
The road project is scheduled for completion within 36 months.




